{"id":18409,"date":"2016-03-02T00:00:00","date_gmt":"2016-03-01T21:00:00","guid":{"rendered":"https:\/\/www.bgports.bg\/obyavleniya\/rehabilitation-of-pier-8-berth-port-of-burgas\/"},"modified":"2016-03-02T00:00:00","modified_gmt":"2016-03-01T21:00:00","slug":"rehabilitation-of-pier-8-berth-port-of-burgas","status":"publish","type":"obyavleniya","link":"https:\/\/www.bgports.bg\/en\/obyavleniya\/rehabilitation-of-pier-8-berth-port-of-burgas\/","title":{"rendered":"Rehabilitation of Pier 8 Berth, Port of Burgas"},"content":{"rendered":"<p>The subject of the contract is &#8220;Rehabilitation of Pier at Berth 8, Port of Burgas&#8221;, and it includes the planned construction and installation works to be performed by the contractor for the rehabilitation of the quay wall, which are: \u2022 Dismantling, cleaning, and sorting of existing sidewalk paving slabs; \u2022 Dismantling, cleaning, and sorting of granite blocks for steps with dimensions 105\/35\/15; \u2022 Breaking of reinforced concrete; \u2022 Dismantling of the angle bar along the quay edge; \u2022 Excavation of backfill material with an excavator and transportation to a landfill; \u2022 Transportation of excavated earth to a dump site; \u2022 Delivery of sulfate-resistant concrete C25\/30, filling into jute bags, and arrangement on the sea side; \u2022 Formwork \u2013 for the quay wall; \u2022 Fabrication and installation of reinforcement steel grade b235(ai), b420(\u0430iii) for the quay wall; \u2022 Laying of sulfate-resistant concrete C25\/30 for quay walls; \u2022 Construction of backfill riprap \u2013 BCM; \u2022 Layer of crushed stone 40\/120 \u2013 incl. compaction; \u2022 Layer of crushed stone 0\/63 \u2013 incl. compaction; \u2022 Formwork for step foundations; \u2022 Laying of PVC foil; \u2022 Fabrication and installation of reinforcement steel grade b235(ai) for pavement; \u2022 Angle bar along the quay edge 100\/100\/10 \u2013 incl. drilling of holes, anchor installation and welding, priming with anti-corrosion primer, painting; \u2022 Laying of sulfate-resistant concrete C25\/30 for pavement d=10cm and step foundations d=10cm; \u2022 Construction of pavement from sidewalk slabs 40\/40; \u2022 Installation of granite blocks for steps. The Contractor shall perform the planned Construction and Installation Works (CIW) under the scope of the contract based on the Technical Specification and Bill of Quantities (BoQ) prepared, coordinated, and approved within this procedure.  <\/p>\n","protected":false},"template":"","kategoriia":[10],"class_list":["post-18409","obyavleniya","type-obyavleniya","status-publish","hentry","kategoriia-publichni-pokani"],"_links":{"self":[{"href":"https:\/\/www.bgports.bg\/en\/wp-json\/wp\/v2\/obyavleniya\/18409","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bgports.bg\/en\/wp-json\/wp\/v2\/obyavleniya"}],"about":[{"href":"https:\/\/www.bgports.bg\/en\/wp-json\/wp\/v2\/types\/obyavleniya"}],"wp:attachment":[{"href":"https:\/\/www.bgports.bg\/en\/wp-json\/wp\/v2\/media?parent=18409"}],"wp:term":[{"taxonomy":"kategoriia","embeddable":true,"href":"https:\/\/www.bgports.bg\/en\/wp-json\/wp\/v2\/kategoriia?post=18409"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}